Tech PDF

BS

BS 4465:1986

Click here to purchase
Requirements for hoists used as temporary installation during building construction work and which are primarily intended for the carriage of personnel but which may also carry materials. The hoist cage suspension is either by steel wire ropes or by rack and pinion with a maximum speed of 2 m/s.

All current amendments available at time of purchase are included with the purchase of this document.

Product Details

Published:
10/31/1986
ISBN(s):
0580152561
Product Code(s):
10556384
Note:
This product is unavailable in Ukraine, Russia, Belarus