Tech PDF

API

API RP 5L8 (R2015)

Click here to purchase
Covers the qualification of inspection personnel, a description of inspection methods, and apparatus calibration and standardization procedures for various inspection methods. The evaluation of imperfections and marking of inspected new line pipe are included. Also included are recommended procedures for field inspection and testing of new plain-end line pipe. This document was prepared specifically to address the practices and technology used in field inspection of line pipe, and certain parts are not suitable or appropriate for mill inspections.

Product Details

Published:
03/01/1997
Number of Pages:
50
File Size:
1 file , 3.5 MB
Product Code(s):
G05L82, G05L82, G05L82
Note:
This product is unavailable in Cuba, Iran, North Korea, Syria